Aneesh P. Bhagvat, Vasishta R. B. and Chethan K. S. (2026) “Power-Aware Task Scheduling using a MATLAB/Simulink Simulation Process”, Advance Research in Power Electronics and Devices, pp. 1–8. Available at: https://matjournals.net/engineering/index.php/ARPED/article/view/3734 (Accessed: 5 July 2026).